Autonomous pallet transport

Assess repeated movements between pallet handover points.

How is the project assessed?

Pallet handling depends on pallet construction, load stability and pickup or delivery height as well as dimensions. Review actual pallets together with the handover stations.

Pedestrians, forklift traffic, waiting points, doors and floors affect route calculations. Many short tasks can need a different fleet from a few long tasks carrying the same load.

This page does not establish equivalence between OPAL and LR product codes. Confirm the current official model, capacity and configuration in the technical offer and datasheet.

Example system flow

  1. 01Input / task
  2. 02Identity / control
  3. 03Handling / processing
  4. 04Delivery / record

Information for technical review

  • Load, product and label samples
  • Layout and target flow
  • Software interface and acceptance criteria

How is the configuration defined?

Load and conditionsAssessed with samples and the site inventory.
Speed / cycle timeDefined by task mix and layout calculations.
Dimensions and interfacesSpecified in the selected model’s approved technical offer.
Safety, warranty and maintenanceConfirmed by documentation and the written project scope.

Capacity, timing, compatibility and price are defined in the technical offer after samples, site data and scope are reviewed. This page does not make unverified performance or certification claims.

Related solutions

Questions before a project

Will it work with our existing system?

The team reviews machines, PLCs, software and interfaces. Compatibility, connection responsibility and additional hardware are defined in the technical offer; universal compatibility is not assumed.

Can we start with a pilot or trial?

Start with a limited task and acceptance criteria. Samples or site data define the trial, measures and next decision. Pilot availability and terms are agreed for the specific project.

Does installation stop production?

Connections and safety requirements may need a planned stop or test window. Agree the schedule with production and maintenance teams; zero downtime is not guaranteed.

How are capacity and price determined?

Product or load samples, target flow, conditions and integration scope are reviewed. The final configuration and commercial offer are based on these inputs.

How are data and software interfaces planned?

Define data sources, interfaces, permissions, retention and recovery responsibilities. On-site or cloud deployment is assessed against the customer environment.

What is the service and maintenance scope?

Discuss maintenance access, training, spares and remote support in the offer. Coordination with STU Servis is available through the group; warranty and response commitments require a written scope.

Your project enquiry

Send your contact and project details. Your enquiry is saved in the private enquiry system and a reference is shown on this page.

Enter at least an email address or phone number.