How is the project assessed?
Pallet entry, fork spacing, load centre and station tolerances are starting inputs for an autonomous forklift. Assess how the carried load affects visibility and stability in the safety review.
Rack, conveyor and floor handovers have different mechanical requirements. Traffic and pallet-detection conditions need samples and site testing.
Lift height, battery, navigation and safety equipment are model-specific. Suitability is defined by the survey and technical scope; this page does not assign specifications to an unconfirmed model.
Example system flow
- 01Input / task
- 02Identity / control
- 03Handling / processing
- 04Delivery / record
Information for technical review
- Load, product and label samples
- Layout and target flow
- Software interface and acceptance criteria
How is the configuration defined?
| Load and conditions | Assessed with samples and the site inventory. |
|---|---|
| Speed / cycle time | Defined by task mix and layout calculations. |
| Dimensions and interfaces | Specified in the selected model’s approved technical offer. |
| Safety, warranty and maintenance | Confirmed by documentation and the written project scope. |
Capacity, timing, compatibility and price are defined in the technical offer after samples, site data and scope are reviewed. This page does not make unverified performance or certification claims.
Related solutions
Questions before a project
Will it work with our existing system?
The team reviews machines, PLCs, software and interfaces. Compatibility, connection responsibility and additional hardware are defined in the technical offer; universal compatibility is not assumed.
Can we start with a pilot or trial?
Start with a limited task and acceptance criteria. Samples or site data define the trial, measures and next decision. Pilot availability and terms are agreed for the specific project.
Does installation stop production?
Connections and safety requirements may need a planned stop or test window. Agree the schedule with production and maintenance teams; zero downtime is not guaranteed.
How are capacity and price determined?
Product or load samples, target flow, conditions and integration scope are reviewed. The final configuration and commercial offer are based on these inputs.
How are data and software interfaces planned?
Define data sources, interfaces, permissions, retention and recovery responsibilities. On-site or cloud deployment is assessed against the customer environment.
What is the service and maintenance scope?
Discuss maintenance access, training, spares and remote support in the offer. Coordination with STU Servis is available through the group; warranty and response commitments require a written scope.
Your project enquiry
Send your contact and project details. Your enquiry is saved in the private enquiry system and a reference is shown on this page.